Analysis of Thermite Rail Joint Damage in Curve Section 3 of Lrt Jakarta

Authors

  • Heriyanto Wibowo Faculty of Management and Business, Institut Transportasi dan Logistik Trisakti, Jakarta, Indonesia
  • Insan Kamal Faculty of Management and Business, Institut Transportasi dan Logistik Trisakti, Jakarta, Indonesia
  • Dhea Ananda Safitri Faculty of Management and Business, Institut Transportasi dan Logistik Trisakti, Jakarta, Indonesia

DOI:

https://doi.org/10.38035/jim.v3i4.2133

Keywords:

Alumino Thermit Welding, Welding Joints, Rail Defects, Fishbone Diagram, LRT Jakarta

Abstract

This study analyzes the damage to the Alumino Thermit Welding (ATW) rail joints in the curved Section 3 between Pulomas Station and Boulevard Selatan Station of the Jakarta LRT. Using a qualitative method with a cause-and-effect approach through a fishbone diagram, the study identifies the factors causing the damage. The results show that the damage is classified as Surface Defect. The primary contributing factors are the small curve radius, imbalance of train wheels, and the driving technique of the train operator, with the highest frequency at 46.15%. This is followed by inspections conducted only visually at night with limited lighting, contributing 38.46%. Material factors have the smallest contribution, at 15.38%. For repairs, it is recommended to use methods such as patching with electric welding, grinding, and re-welding, along with routine inspections using Ultrasonic Testing. Coordination with the OCC and Crew Unit Leaders (train operators) regarding the recommended speed limits on curves is crucial, and the implementation of sensor technology for real-time monitoring of rail conditions should also be considered.

References

Abdussamad, Z. (2021). Metode Penelitian Kualitatif. Syakir Media Press.

DHARMAWAN, H. (2022). Analisa Risiko Kecelakaan Kerja Dengan Metode Fishbone Diagram Dan Scat Saat Pelaksanaan Stern Bunker Guna Meminimalisir Kecelakaan Kerja Di Atas Kapal MT. B STAR. Politeknik Ilmu Pelayaran Semarang.

Ihlas, A. (2017). Analisis Kerusakan Rel Kereta Api Angkutan Batubara. Jurnal Teknologi Bahan Dan Barang Teknik, 7(1), 7. https://doi.org/10.37209/jtbbt.v7i1.89

IRICEN. (2014). Welding Techniques. In INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING.

Jessy Kartini, G. A., Utama Putra, A. H. P., & Nugroho, H. (2021). Detection of Rail Geometry Irregularities Using Point Cloud Data from Terrestrial Laser Scanner (Study Case: Curve No. 106, Railroad between Cipatat-Tagogapu, Indonesia). IOP Conference Series: Earth and Environmental Science, 731(1). https://doi.org/10.1088/1755-1315/731/1/012005

Jezzini-Aouad, M., Flahaut, P., Hariri, S., Zakrzewski, D., & Winiar, L. (2010). Improving fatigue performance of alumino-thermic rail welds. Applied Mechanics and Materials, 24–25, 305–310. https://doi.org/10.4028/www.scientific.net/AMM.24-25.305

Liu, Y., Tsang, K. S., Tan Zhi’En, E., Alagu Subramaniam, N., & Pang, J. H. L. (2021). Investigation on material characteristics and fatigue crack behavior of thermite welded rail joint. Construction and Building Materials, 276, 122249. https://doi.org/10.1016/j.conbuildmat.2021.122249

Martono, N. (2014). Metode Penelitian Kuantitatif: Analisis Isi dan Analisis Data Sekunder (S. P. Triutami (ed.); Revisi 2). PT Rajagrafindo Persada.

Mu’allimah, & Mashpufah, R. N. (2021). Analisis Kebijakan Pemerintah Provinsi Dki Jakarta Dalam MENGATASI PERMASALAHAN TRANSPORTASI DI PERKOTAAN. Jurnal Manajemen Dan Ilmu Administrasi Publik, 3, 291–296.

Mundrey, J. S. (2018). Railway Track Engineering. McGraw Hill Education.

Nelfira, W. (2023). Groundbreaking LRT Jakarta Fase 1B, Heru Budi: Ada 5 Stasiun. LIPUTAN 6. https://www.liputan6.com/news/read/5436265/groundbreaking-lrt-jakarta-fase-1b-heru-budi-ada-5-stasiun?page=2

Pramudita, W. P., & Nataadmadja, A. D. (2023). Analysis of the performance of light rail transit (LRT) Jakarta as a transport demand management (TDM) strategy. IOP Conference Series: Earth and Environmental Science, 1169(1). https://doi.org/10.1088/1755-1315/1169/1/012021

Prawata, A. (2014). Fasilitas Transit Transportasi Umum sebagai Media untuk Menciptakan Mobilitas dan Bagian Kota Jakarta yang Sehat. ComTech: Computer, Mathematics and Engineering Applications, 5(2), 879. https://doi.org/10.21512/comtech.v5i2.2293

Purwanto, D. (2019). Kekuatan Sambungan Las Thermit Rel R 54 Untuk Jalur Lintas Angkutan Batubara. Material Komponen Dan Konstruksi, 11(2), 81–89. https://doi.org/10.29122/mkk.v11i2.551

Ristyanto, A., Dwi Haryadi, G., & Umardani, Y. (2014). PENGARUH PROSES NORMALIZING TERHADAP NILAI KEKERASAN DAN STRUKTUR MIKRO PADA SAMBUNGAN LAS THERMITE SIMILLAR BAJA UIC-54 (Union Internasionale des Chemins de fer-54). Jurnal Teknik Mesin S-1, 2(2), 36–45.

San San, M. (2019). Analisa Produktivitas Pengelasan Rel Light Rail Transit Dengan Menggunakan Flash Butt Welding Dan Alumino Thermit Welding Terhadap Waktu Pelaksanaan (STUDI KASUS: PROYEK LRT JAKARTA VELODROME – KELAPA GADING). UNIVERSITAS MERCU BUANA.

Sugiyno, P. D. (2013). Metode Penelitian Kuantitatif Kualitatif, dan R&D. ALFABETA.

Surwono, J. (2006). Metode Penelitian Kuantitatif & Kualitatif (Cetakan Pe). Graha Ilmu.

Susendi, N., Suparman, A., & Sopyan, I. (2021). Kajian Metode Root Cause Analysis yang Digunakan dalam Manajemen Risiko di Industri Farmasi. Majalah Farmasetika, 6(4), 310. https://doi.org/10.24198/mfarmasetika.v6i4.35053

Sutiyatno, S. (2017). METODOLOGI PENELITIAN (Penelitian Teknologi Informasi, Penelitian Kuantitatif dan Kualitatif, Penelitian Eksperimen, Penelitian Research & Development dan Penelitian Tindakan). K-Media.

Utomo, S. H. T. (2006). Jalan Rel. Beta Offset Yogyakarta.

Widyahening, C. E. (2018). Penggunaan Teknik Pembelajaran Fishbone Diagram Dalam Meningkatkan Keterampilan Membaca Siswa. Jurnal Komunikasi Pendidikan, 2(1), 11. https://doi.org/10.32585/jkp.v2i1.59

Williams, C., Gdiptm, C. W., Presented, C., Maciver, J., Williams, C., Gdiptm, C. W., Presented, C., & Maciver, J. (2009). Human Error in Railway Operations Control. AusRAIL PLUS 2009, November, 1–26.

Yantony, D., & Parekke, S. (2023). Teknologo Pengelasan Logam (Jilid 1) (M. Nasrudin (ed.)). PT Nasya Expanding Magagement.

Yao, N., Jia, Y., & Tao, K. (2020). Rail Weld Defect Prediction and Related Condition-Based Maintenance. IEEE Access, 8, 103746–103758. https://doi.org/10.1109/ACCESS.2020.2999385

Yılmaz, H., & Öztürk, Z. (2015). Investigation of rail defects using an ultrasonic inspection method: A case study of aksaray-airport light rail transit line in Istanbul. WIT Transactions on the Built Environment, 146, 687–698. https://doi.org/10.2495/ut150561

Downloads

Published

2025-02-18

How to Cite

Wibowo, H., Kamal, I., & Safitri, D. A. (2025). Analysis of Thermite Rail Joint Damage in Curve Section 3 of Lrt Jakarta. Jurnal Ilmu Multidisiplin, 3(4), 704–712. https://doi.org/10.38035/jim.v3i4.2133