[1]
Aminudin, M. et al. 2026. Improving Network Fault Protection at 20/0.4 kV for General Hospital Operations through ETAP Simulation-Based Protection Relay Re-Setting. International Journal of Advanced Multidisciplinary. 5, 2 (Aug. 2026), 181–187. DOI:https://doi.org/10.38035/ijam.v5i2.2278.